Lodge Manufacturing Company, South Pittsburg, Tennessee, has begun a multiphase plan for expansion and upgrades to their existing, highly successful foundry. “This is more massive than anything we’ve ever done before,” stated Henry Lodge, President & COO of Lodge Manufacturing and great grandson of the business founder, Joseph Lodge. “We are excited and we need this additional production.”
Lodge approached Vulcan Engineering Co. to discuss the next steps in making expansion a reality. With a history of working with Vulcan on past projects, Lodge took into consideration the relationships built over the years as well as the consistency of work; from sound industry advice to the quality of process planning and engineering. “Clearly Vulcan has plenty of knowledge and experience. They work to identify the potential problems and bring them to us; we don’t have to find them later,” said Henry. “I knew we could trust them with this job, and I can sleep a lot easier,” stated Michael Whitfield, Lodge Vice-President.
“Vulcan listened to our needs and goals for the future. They developed two different approaches to achieve our desires, allowing us to decide which method would be the best fit. Our main operational requirements were that the foundry could not shut down during construction and that the newly expanded foundry be designed in such a way to allow for additional growth in the years ahead,” Whitfield stated. “Once we selected the plan Vulcan developed a reasonable, economic plan utilizing three distinct phases to achieve our overall goals. The design was a structured approach to maintain ongoing existing capacity while installing the infrastructure for our future capacity requirements.”
Phase I also incorporates all design and equipment specifications to allow for future expansions which will ultimately replace all existing molding lines with new, state of the art, higher output equipment. With this design approach each additional phase completed will further enhance efficiency and output of casting production. For each additional expansion, an entire molding system will be replaced and prepared sand capacity will be increased for the additional demand created. Although prepared sand and casting tonnage will be increasing with each additional phase, the Phase I handling equipment has been designed and installed with the capacity to accommodate full future demand of the foundry through Phase III.